Prefabricated part for cable duct ÖBB

Prefabricated part for cable duct ÖBB Projects Effective steel reinforcement reduction 640 kg steel replaced by 4,50 kg/m3 Concrix ES fibre dosage. 65 % less steel compared to original solution. Advantages of Concrix ES solution: Massive reduction of steel reinforcement assembly Significant reduction of CO₂ emissions No corrosion Longer durability 3-dimensional reinforcement reaching all edges…

Puskás Ferenc National Stadium, Budapest/HU

Puskás Ferenc National Stadium, Budapest/HU Projects Description For the construction of the stadium, which can hold up to 68,000 spectators, prefabricated concrete parts were used for the construction of the grandstand. These elements are reinforced with pre-stressed steel and Concrix ES macrofibres. Advantages of Concrix ES solution: Durability of Concrix and thus longer lifetime/less maintenance…