Foundation plate for TBM – Bözberg tunnel (CH)
Projects
Description
The new SBB Bözberg tunnel (≈ 2500 m length) has to be drilled by the TBM «S1012 Bözberg». To reach the starting position the TBM needs a foundation plate to move forward with its walking legs. The construction company decided to switch to the synthetic high-performance fibre Concrix ES.
Advantages of Concrix ES solution:
- Cost savings (almost no steel, lower logistic costs, shorter construction time)
- The ease of operation with fibre reinforced concrete
- Very high performance of the fibre
- Static calculation based on European Standards
Application Infrastructure rail sub foundation
Object Bözberg tunnel
Country Switzerland
Year 2017
Fibre Concrix ES – 4,5 kg/m³