Waste water intake structure (NL)

Waste water intake structure (NL) Projects Description This prefabricated concrete element is made with C 50/60 concrete and reinforced with 4,0 kg/m³ macro synthetic fibres. The use of the  fibres is mainly to avoid damages, especially at the edges, during transport and handling of the elements. Advantages of Concrix ES Solution: Lower cost for reinforcement…

Roundabout Stein AG (CH)

Roundabout Stein AG (CH) Projects Description Roundabouts, but also other traffic areas that are constructed with asphalt, often suffer deformations over time from heavy trucks and buses, especially during the warm season. Surface: broom stroke   Advantages of Concrix ES Solution: Less or no deformations thanks to the use of concrete Short construction time (no…

Precast Traffic Block Element For Railway Tunnel – Israel (ISR)

Precast Traffic Block Element For Railway Tunnel – Israel (ISR) Projects Description These elements between the rails allows rescue vehicles driving into the railway tunnel in case of an emergency.   Advantages of Concrix ES Solution: Durability of Concrix and thus longer lifetime/less maintenance Lower cost for reinforcement (totally replacement of steel) Rapid production of…

Exploration Tunnel Feldkirch City Tunnel (AT)

Exploration Tunnel Feldkirch City Tunnel (AT) Projects Description The construction of the 1212-meter-long exploration tunnel Tisis, as part of the Feldkirch City Tunnel project in Austria, was initiated by the Allianz EKS Tisis Jägerbau, Strabag, State of Vorarlberg. To fulfil its safety function after excavation and also as part of the permanent inner shell, macro-fibre…