Road construction – Bus Stop & Bus Line in Amsterdam (NL)

Projects

Description

The bus stops and bus lines in the city of Amsterdam was constructed by the specialist company Den Ouden. The 22 cm fibre reinforced concrete slab on soil is constructed with cutting joints each 7,00 m including dowels which allows horizontal movement but prevented vertical movement of the slab.

Surface – broom finish.

 

Advantages of Concrix ES Solution:

  • Lower cost for reinforcement (replacement of steel)
  • LCA certified macro fibre, means less CO₂ consumption
  • Less logistic costs and shorter construction time (replacement of steel)
  • No corrosion and thus lower future maintenance cost
  • Free of charge state-of-the-art static calculation (finite elements) based on latest standards (Eurocode 2)

Application Infrastructure road
Object Bus Stop & Bus Line
Size ≈500 m²
Country Netherlands
Year 2018
Fibre Concrix ES, 4,5 kg/m³