The quay was built on piles and a special vehicle with a point load of 31 tons had to be considered for the calculation. Corrosion had to be avoided.

Advantages of Concrix ES solution:

  • Possibility to build a high-loaded slab on pile-supported subbase
  • Lower cost for reinforcement (replacement or reduction of steel)
  • Less logistic costs and shorter construction time (replacement of steel)
  • No corrosion and thus lower future maintenance cost
  • Free of charge state-of-the-art static calculation (finite elements) based on latest standards (Eurocode 2)

Application External area
Object 
Harbour
Size 9 000 m²
Country Poland
Year 2014
Fibre Concrix ES – 3,0 kg/m3