Quay, Port in Stettin (PL)
Projects
Description
The quay was built on piles and a special vehicle with a point load of 31 tons had to be considered for the calculation. Corrosion had to be avoided.
Advantages of Concrix ES solution:
- Possibility to build a high-loaded slab on pile-supported subbase
- Lower cost for reinforcement (replacement or reduction of steel)
- Less logistic costs and shorter construction time (replacement of steel)
- No corrosion and thus lower future maintenance cost
- Free of charge state-of-the-art static calculation (finite elements) based on latest standards (Eurocode 2)
Application External area
Object Harbour
Size 9 000 m²
Country Poland
Year 2014
Fibre Concrix ES – 3,0 kg/m3