Hydropower plant
Hydropower plant Projects Application Shotcrete tunnel Country Costa Rica Location Cachi Year 2013 Additional steel reinforcement No Fibre Concrix ES
Hydropower plant Projects Application Shotcrete tunnel Country Costa Rica Location Cachi Year 2013 Additional steel reinforcement No Fibre Concrix ES
Excavation, shotcrete infill – Biology Centre University Vienna (AT) Projects Description The excavation stabilisation made with discontinuous bored pile walls with shotcrete infilling for the new Biology Centre for the University of Vienna. The originally planned reinforcement for infilling was AQ 65 steel mesh (332 mm²/m), which was totally replaced by using macro fiber reinforced…
Prefab modular houses – Tallinn (EST) Projects Description Prefab modular houses made in Estonia. The element thickness of walls, floor and ceiling is 7 cm and only fibre reinforced concrete. No fibres visible at the surface of elements made with white cement. Advantages of Fibrofor High Grade Solution: Lower cost for reinforcement (replacement or reduction…
Various precast elements, from simple pure fibre designs, to more complex hybrid solutions… Projects Advantages of Concrix ES Solution: Massive reduction of steel reinforcement assembly Significant reduction of CO₂ emissions No corrosion Longer durability 3-dimensional reinforcement reaching all edges Customised structural dimensioning
Precast facade elements – Mirador de Malilla, Valencia (ES) Projects Advantages of Concrix ES Solution: Increased production efficiency Cost reduction 3-dimensional reinforcement reaching all edges Application Precast facade Project Mirador de Malilla, Valencia Manufacturer INDAGSA – Grupo Ortiz Fibre Concrix ES
Waste water intake structure (NL) Projects Description This prefabricated concrete element is made with C 50/60 concrete and reinforced with 4,0 kg/m³ macro synthetic fibres. The use of the fibres is mainly to avoid damages, especially at the edges, during transport and handling of the elements. Advantages of Concrix ES Solution: Lower cost for reinforcement…
Photo story – Prefab wall elements for detached-family houses, NL Projects Application Precast seperation wall Object Prefab walls for single-family houses Country Netherlands Year 2018 Fibre Concrix ES
Concrete Terrazzo Floor – Secondary School Projects Application Inside flooring Client Public School Board Object Secondary School Area 1 500 m² City Neukirch-Egnach (CH) Year 2017 Fibre Fibrofor High Grade – 1,0 kg/m³
Besiktas Stadium, Istanbul (TR) Projects Description A completely new stadium is built in Istanbul. But the progress of construction work was behind time schedule. A solution to save time and cost has been highly appreciated. Advantages of Fibrofor High Grade Solution: Massive time savings (construction time) Lower cost for reinforcement (replacement of steel) Reduced labour…
Moya Sunny Garden, Slazany (SK) Projects Description A huge Greenhouse with a size of more than 6 000 m², containing modern technology for growing fresh vegetables. The building includes the farming area as well as all necessary technical facilities. Advantages of Fibrofor High Grade Solution: Massive time savings (construction time) Reduced labour cost (no/less installation…